Reasonable operation and application of machine tool chip conveyor

whether the machine tool chip conveyor can work normally for a long time is directly related to whether the chip remover can operate reasonably and whether it is maintained in time.wrong operation can lead to equipment accidents and personal accidents.the main reason of the equipment accident is that the transmission chain is broken by the material, and the transmission chain is broken.
the following is for you to introduce the reasonable operation steps and precautions of the machine tool chip conveyor:
1. please carefully check all parts of the equipment before starting, and pay attention to whether there are people or other sundries on the transmission chain.turn on the signal only if there is no problem.when many drive chains are in series, the starting sequence is from the unloading end to the loading end.after starting, it idles for one cycle.after inspection, when all parts are normal, the load can be loaded.
2. after the machine tool chip conveyor works, the operator must concentrate on fixing it on the column, and the driver of the transmission chain must always check along the way to find the problem and remove it in time.
3. in the work, pay attention to check whether the motor, transmission device, transmission gear, coupling, transmission chain plate, drum, roller, etc. are normal;effectiveness of cleaners and brakes, especially upstream and downstream drive chain systems.devices on the move must be reliable to prevent flight.
4. if any abnormal situation is found during the operation, such as transmission chain deviation, skid or random jump, it should be adjusted in time.when the transmission chain skids, it is strictly prohibited to insert things between the roller and the transmission chain.if the tightness of the transmission chain is not appropriate, the tensioning equipment should be adjusted in time.chip removal rack must be firmly connected to any place, and there is no crack, deformation or abnormal movement.
5. when working on the equipment, no one is allowed to walk or ride on the transmission chain.
6. frequently check the grounding maintenance and insulation of electrical equipment, and regularly measure and check the motor with instruments, and timely maintenance.
7. in practical application, often clean dirt on the transmission chain drum.it is strictly prohibited to clean it with triangles, spades, sticks, etc., without closing it.
8. the feed on the transmission chain must be uniform to prevent excessive material from crushing the transmission chain and affecting the safe operation of the equipment.

常州到伊通县专线物流公司_常州到四平伊通县物流公司零担专线
MEISTER流量开关WY-15 G 1/2 MS NOC M12产品型号代码及特点介绍
东莞大岭山镇到武汉物流专线运输_优质东莞大岭山镇到武汉物流公司
厦门到泉州泉港区物流专线货运直达_厦门到泉港区物流公司
无锡新吴区到阳曲县物流专线_无锡新吴区到太原阳曲县物流专线运输
Reasonable operation and application of machine tool chip conveyor
武汉东西湖区到中山专线物流公司_武汉东西湖区到中山物流公司
广州花都区到南京鼓楼区货运公司,广州花都区到鼓楼区物流专线货运直达
专业海盐到安溪物流公司,优质海盐到福建安溪物流专线
深圳宝安区到肥东物流专线_深圳宝安区到合肥肥东物流专线货运
福州到竹山县专线物流公司_福州到十堰竹山县物流公司回程车
张家港到香河货运专线_优质张家港到廊坊香河物流专线公司
2903370 采用插拔式连接的预装继电器模块,包括:继电器底座(带弹出装置)
天津宝坻区到重庆江北区货运专线_天津宝坻区到江北区物流公司专线直达
广州花都区到肥西专线物流公司,广州花都区到合肥肥西物流公司
绍兴到上海直达物流专线_绍兴到上海物流公司
广州到梧州万秀区专线物流货运_广州到万秀区物流专线运输公司
宁波到池州贵池区专线物流公司_宁波到贵池区专线货运[直达运输]
昆明到瓜州县专线物流运输,昆明到酒泉瓜州县物流专线公司
上海到麻江县专线物流公司_上海到黔东南麻江县专线货运[直达运输]